Pre-construction is key to your project's success

We know how critical the early stages of a project are to its overall success. That’s why we’ve developed a robust civil engineering project planning process designed to give you the clarity, efficiency, and confidence needed to make informed decisions.

Through detailed site designs and investigations, we provide the insights you need to plan effectively. Whether you’re undertaking a large-scale redevelopment or a smaller repair project, our in-house construction team brings decades of expertise and precision. As a principal contractor, we ensure every project—no matter the size—is handled with the same level of care, compliance, and safety.

By working closely with you from the start, we ensure your project is phased for efficiency and minimal disruption, keeping operations running smoothly. With proactive risk management, and a team you can trust, our pre-construction process removes uncertainty and keeps your civil engineering project on track from day one.

01 Initial Consultation

We start by meeting to understand your project requirements. A detailed site survey is then conducted to assess the site’s current conditions, identify potential challenges, and gather essential data. This proactive approach ensures the civil engineering project planning is well structured, minimising risks and keeping your project on schedule.

02 Scope Creation

Using the findings from the site survey, we create a detailed project scope. This defines objectives, timelines, deliverables, and resource requirements. Your collaboration ensures the scope meets operational needs, budgets, and long-term goals.

03 Design and Technical Review

Our in-house engineering team reviews the project design for efficiency and compliance with all regulations. Value engineering options are explored to optimise costs while maintaining high standards.

04 Pre-construction Setup

Before construction begins, we create a pre-construction plan. This includes logistics, site access, utilities setup, and temporary works. Compliance with CDM Regulations is prioritised, with all health, safety, environmental and welfare measures meticulously documented and efficiently implemented.